task:
Renewal of the mixing system of a concrete plant, incl. staircase
year of manufacture:
2014
measurements:
height 30 m, conveying capacity 160 m³/h, 250 t/h sand, gravel, graining up to 45 mm
partner:
Holcim Kies & Beton GmbH, Sindelfingen
project scope:
belt bucket elevator, oscillating conveyor, conveyor belt, distribution belt with rotating assembly, stairway