task:
Construction of a double germination box system for approx. 5 tons of green malt each made of material 1.4571 in an old rock cellar
year of manufacture:
2022 to 2024
measurements:
ca. 20 x 2 x 1,9 m
partner:
Raubierbrauerei Schlenkerla „Heller-Bräu“ Trum KG, Bamberg
project scope:
Pipe construction from the steep to the germination box, germination box, emptying of the germination box to the kiln, control system construction, support for other trades