Construction of a silo system as an intermediate buffer before sterilization

Projects

Construction of a silo system as an intermediate buffer between kiln and sterilization as well as increasing the conveying capacity when emptying the kiln

task:
Construction of a silo system as an intermediate buffer between kiln and sterilization as well as increasing the conveying capacity in the emptying of the kiln

year of manufacture:
2021

measurements:
Silo eaves height 17.7 m Base area 2 units 3x3 m each

project scope:

  • Various trough chain conveyors and belt bucket elevator as discharge from the kiln, conveying capacity 260 m³/h, 130 t/h kilned malt
  • Silo cells with 2x160 m³ capacity, enclosed
  • Various trough chain conveyors as discharge conveyors from the intermediate silos, conveying capacity 60 m³/h, 30 t/h
  • Various slides, platforms, supports

partner:
Octogon GmbH